• Sr. Construction Scheduler

    Job Locations US-TX-Dallas
    Requisition ID
    2018-2459
    Category
    Construction and Extraction
  • Overview

    Do you want to make a difference when it comes to building iconic structures?  Are you looking to put your strong, construction scheduling skills to use while building hospitality, healthcare, aviation, high-rise, mixed-use and higher education structures?  Austin Commercial is currently seeking a Sr. Construction Scheduler to be located at our corporate headquarters in Dallas, TX.  We excel at what we do and are looking for talented construction professionals that want to excel with us. 

     

    The Sr. Scheduler prepares summary level and detailed schedules for proposed or current construction projects.  Schedules will be prepared using bar chart or CPM format as required by the project team or owner.  Schedules will be prepared using Primavera P6 Project Planner or Primavera SureTrak scheduling software.  Provide progress / schedule updates as required for each project. 

     

    Functional Areas of Responsibility

     

    • Schedule preparation
    • Schedule Analysis
    • Cost Loading
    • Schedule Updates
    • Progress Reporting
    • Scheduling Training
    • As-built Schedules
    • Recovery Schedules
    • Technical Support for software
    • Estimating/Takeoff assistance (occasionally)
    • Current Status vs. Baseline Reporting

    Responsibilities

    • Prepares summary level schedules for proposed projects. These are used to determine overall project duration, general conditions, and hoisting needs and are to be inserted into the proposal that will be submitted to the client. 
    • Prepares detailed schedules for projects. This is done as early on in the project as possible. 
    • The Scheduler assumes overall responsibility for the project schedules.
    • The Scheduler assists in schedule needs relative to 'contract' schedule vs. accelerated schedule as required by the project team. Provide schedules that will need to be issued with contracts or bid documents to subcontractors and suppliers.  Cost / resource loading of schedules (and reporting) when required.
    • The Scheduler works with subcontractors and suppliers to establish timely deliveries of equipment and materials.
    • Performs Progress / Schedule Updates: Visit and walk projects to gather update/actual information.  Interface with the Superintendent and project team with regard to schedule actuals and projections. 
    • The Scheduler provides as-built schedule information for use in the project completion reports.
    • He or she updates the current workload schedule quarterly.
    • The Scheduler provides scheduling training to personnel as required.
    • The position requires travel of up to 50%.

    Qualifications

    • A Bachelor’s of Science degree in construction management or related degree is preferred
    • Must have 8+ years’ experience in commercial construction scheduling
    • Must have large program or program management experience on projects of at least $75M in the commercial construction field.
    • Construction field experience is a major plus i.e. Superintendent, Field Engineer
    • Strong knowledge of construction systems and trade sequencing
    • Presentation skills required in meetings and in training.
    • Must be able to read blueprints
    • Primavera (Oracle) P6, P7 or P8 experience
    • Must be able assist project team in planning workflow and phasing as required

     

    We offer excellent benefits including medical insurance, dental insurance and a matching 401K plan and we are proud to be a 100% Employee Owned CompanyTo learn more about Austin’s Employee Ownership history, please go to http://www.austin-ind.com/employee-ownership.html

     

    Austin Commercial is an Equal Opportunity Employer.

     

    About Austin Commercial

     

    This is an opportunity to join one of North America's most respected and fastest growing Commercial/Aviation construction firms. With regional operations and iconic projects across the United States, Austin Commercial has clearly established itself as a builder and employer of choice. From complex airports, healthcare facilities, educational institutions, research labs and sports facilities, and other emerging markets, brings ingenuity and a proven track record through construction manager at risk, bid-build, design-build, fast track, etc.

    Apply/Share

    Sorry the Share function is not working properly at this moment. Please refresh the page and try again later.
    Share on your newsfeed